Factory Automation
Automated Hot Water Tank Welding Facility
- Develop and build fully automated seam welding machine with CMT weld
- Develop and build automatic tank transfer
- Develop and build automatic flaring and domes insertion
- Develop, build and incorporate auto socket feed machine to projection welder
- Robot handling
- Robot circular welding
Hot Water Unit Testing and Validating System
- Sustainable Hot Water Unit Testing System
- Recycling water system complies with Plumbing regulations and AS/NZS 3500:1
- Chillier to cool the water
- Store water in insulated tank
- Maintain constant water supply temperature with Refrigerator
Automated Water Tank Integrity Testing Facility
- Hot water inner tank integrity testing facility
- Test and deliver inner tank to production line in less than 20secs
- Automated pressure source engagement and disengagement
- Automated vacuum testing to check for leakage
- Monitor and identify leakage tank
- RFID tagging system
Automated Timber Routing and Stacking Facility
- Operator load full trolley timber onto loading turntable
- Turntable tilts timber stack
-
Turntable rotates – slow down & stop limit switches as well as shot pin
-
Drive carrier pick up timber stacks from the turn table
-
Timber stacks driven and lowered onto routing table
-
PLC system checks and secures the stacks
-
Routing timber
-
Carrier pick up routed timber and drop off at the unloading turntable
-
Turntable rotates after it is full
-
Turntable tilts to place the routed timber onto unloading trolley
-
Operator remove the full trolley from the unloading turntable